Return
Print
Email
Pre-Bent S Curve MonoRail
pre-bent_s_curve_mo_156.jpg

Pre-Bent S Curve MonoRail

$
325
00
/ 1
  • Part Number: 700MOBHSC60BRZ
  • UPC: 00756460993795
  • Availability: Item is usually in stock, but we'll be in touch if there's a problem
Quantity:
Add To Cart
Add To Estimate
Add To Wishlist
Compare Item
Product Variations (2)
Product Overview
BROWN MO HORIZ. S-CURVE ANT.B

Specifications
Details
Category:
Track Ltg.
Subcategory:
Track Accessories
Finish:
Bronze /vendors/vendorImages bronze.jpg
Style:
Contemporary
Option:
Title 20
Category:
Monorail Hardware
Finish:
Antique Bronze
Style:
Contemporary | Modern
Option:
Dry Rated
Bulb Dimmable:
False
Introduction Date:
01/01/2005
Ship Carton Height:
6.00
Ship Weight:
3
Special Features:
From the brand formerly known as Tech Lighting
Vendor Ship Method:
UPS Fedex
Warranty:
1 Year
Weight:
1.10
24 Volt:
False
Adjustable Head:
False
Cable Field Cuttable:
True
Cannot Ship To California:
False
Cannot Ship To Canada:
False
Damp Rated:
False
Dark Sky:
False
Dry Rated:
False
FWC Compliant:
False
Integrated LED:
False
Item Color 1:
Brown
Master Color:
Brown
Motion Sensor Included:
False
Photocell Included:
False
Replaceable Lamp:
False
Reversible:
False
Safety Rating:
ETL
Shape:
Pre-bent S-curve
Sloped Ceiling Compatible:
False
Solar Powered:
False
SORAA:
False
Stocking Type:
Made to Order
System:
MonoRail
Title 20:
False
Title 24:
False
Transformer Required:
False
Warm Color Dimming:
FALSE
WET IP65:
False
Wet Rated:
False
To: From: Subject: